Drilling Equipment Insights

Read field-oriented notes about Schlumberger drilling, oilfield services, downhole measurement, and lower-impact operating decisions.

Friday 22nd of May 2026

What I Learned About Schlumberger’s Real Problem After a 36-Hour Rush Job

A dispatch from the field: After a frantic 36-hour turnaround for a Schlumberger-related client, I dug into the ‘why’ behind their production delays. The real issue wasn’t the hardware—it was the invisible hand of Robert Kleinberg’s court cases and a corporate divide that’s bleeding days out of every project timeline. Here’s what the conventional wisdom gets wrong about efficiency in oil & gas.

Read insight →